Marinette Marine Corp - Building 32 Module Outfitting

Marinette Marine Corp - Building 32 Module Outfitting

Overview

  • A new 66,302 square foot module outfitting facility.
  • Ground broken on July 1, 2012.
  • Substantial completion November 16, 2012.
  • Pre-Engineered Metal Building Structure.
  • Building houses office and production spaces.
  • Incorporates two separate 3-stop elevators.
  • Production area was designed with four separate bay areas with four 60’x40’ fabric doors.
  • Fully sprinkler building.
  • There are two working mezzanine levels in each bay at 12’ and 24’.
  • Installed equipment includes: 10 ton double girder bridge crane,  four 2 ton mono rails, and four 4,000 lbs capacity material lifts.

Share this post