
This 20,000 square foot engineering and communications center was built using Smet Construction Services Tilt-Up Concrete Wall System creating an aesthetically pleasing office exterior. The interior offices house over 100 engineers in private offices and cubicles. The building was constructed during the winter, and the wall panels were cast at Smet Construction’s interior facility.
Smet’s ability to cast concrete wall panels inside our own facility provided a distinct advantage during winter construction. Our Tilt-Up Concrete Wall System kept panel production protected from outdoor conditions while creating an attractive exterior for the 20,000-square-foot engineering and communications center. The finished building combines a professional appearance with a functional workspace, accommodating more than 100 engineers in private offices and cubicles.